The Measure
The State Water Resources Control Board and the Central Valley Regional Water Quality Control Board complete the Phase 2 control plan for the Total Maximum Daily Load and Basin Plan Amendment for dissolved oxygen in the Stockton Deep Water Ship Channel by January 1, 2015.
Measure Details
Phase 2 of the Control Plan for Dissolved Oxygen (DO) in Stockton was completed in 2015. Under Phase 2, the State Water Resources Control Board (SWRCB) had to review the allocations and implementation provisions of the Total Maximum Daily Load (TMDL) control program accounting for DO conditions in the channel. In 2015, the Central Valley Regional Water Board approved the continued implementation of the program for DO impairment. Port of Stockton currently oversees operations and maintains DO water quality objectives.
Delta Plan Strategy
Improve Environmental Water Quality
Delta Plan Recommendation
WQ R11. Manage Dissolved Oxygen in Stockton Ship Channel. The State Water Resources Control Board and the Central Valley Regional Water Quality Control Board should complete Phase 2 of the Total Maximum Daily Load and Basin Plan Amendment for dissolved oxygen in the Stockton Deep Water Ship Channel by January 1, 2015.
Related Output/Outcome Performance Measure
PM 6.5 Dissolved Oxygen